How to use the Planner?

Last changed in 25/02/2026
This article applies to:
PT
ES
AO
CV
MZ
ST
GW

Valuekeep Planner allows maintenance managers and administrators to plan their technicians' work using various calendar views.

Roles

  • Administrator: can view all work orders, preventive maintenance events, and assign a work order to any technician;
  • Maintenance manager: can only view work orders created by himself/herself and those from the work center for which he/she is responsible.

Structure

The Planner is organized into two sections:

  • Filters: filters to apply to the data that will appear in the calendar views;
  • Calendar: This section can be divided into five views, with the default view being the Work Week view. The available views are:
    • Day:
      • Displays assigned work orders, unassigned work orders, and preventive maintenance events for the selected day;
      • Start of the day: 6:00;
      • End of the day: 20:00;
      •   30-minute intervals.
    • Work Week:
      • Displays assigned work orders, unassigned work orders, and preventive maintenance events for the selected work week;
      • Start of the day: 6:00;
      • End of the day: 20:00;
      • 30-minute intervals.
    • Week:
      • Displays assigned work orders, unassigned work orders, and preventive maintenance events for the selected week.
      • Start of the day: 6:00;
      • End of the day: 20:00;
      • 30-minute intervals.
    • Month:
      • Displays assigned work orders, unassigned work orders, and preventive maintenance events for the selected month.
    • Schedule:
      • Displays work orders by technician.

Operations

Several operations can be performed directly in the Planner:

Assign work orders

There are two ways to assign work orders to employees:

  • Drag and drop:
    1. On the Schedule tab, drag the WO to the desired technician;
    2. It is possible to assign the WO to several technicians, but not simultaneously. The assignment must be made technician by technician.
  • Through the context menu:
    1. Right-click on the desired work order, then select the Assign option;
    2. Select the employees to assign and click Save.

Remove assignments

It is possible to remove the assignment of a work order. There are two ways to do so:

  • Drag and drop:
    • In the Schedule tab, drag the WO to the Unassigned section. Or click on the WO number to view its details, then click on the Unassign icon .
  • Through the context menu:
    1. Right-click on the desired work order and then select the Assignment option;
    2. Remove the assignments.

Note: Unassigned work orders are displayed in gray and assigned work orders are displayed in blue.

View work order information

You can view the information for a work order by clicking on it. A pop-up window will appear with the following information:

  • Expected date;
  • Asset;
  • Status;
  • Priority;
  • Responsible.

Create work orders

To create work orders, the following steps must be followed:

  1. Right-click on the desired date/time;
  2. Select the Create Work Order option;
  3. Fill in the fields on the panel displayed;
  4. Click on Save.

Note: you can quickly navigate to the current day by right-clicking on the desired date/time and then selecting the Go to today option.

Edit work orders

To edit work orders, the following steps must be followed:

  1. Right-click on the desired work order;
  2. Select the Edit Work Order option;
  3. Click on the desired operation:
    • Edit: to make the desired changes to the work order;
    • Delete: to delete the work order, by selecting the trash can icon;
    • Attachments: to edit or add attachments to the work order;
    • Copy to New: to clone the record with a new key.

Create WO from preventive event

To create work orders through a preventive maintenance event, the following steps must be followed:

  1. Right-click on the desired preventive maintenance;
  2. Select the Create Work Order option;
  3. The fields in the panel will be filled in automatically, but you can edit the information displayed;
  4. Click Save.

Disable preventive maintenance event

To disable a preventive maintenance event, you must follow these steps:

  1. Right-click on the desired preventive maintenance;
  2. Select the Edit Preventive Maintenance Event option;
  3. In the panel displayed, uncheck the Active option.

Note: only 200 records are displayed in each view.