How to define a maintenance plan tolerance in a preventive maintenance?

Last changed in 30/08/2024
This article applies to:
PT
ES
AO
CV
MZ
ST
GW

When creating a preventive maintenance, on the tab "Planned Work", you can add a Maintenance Plan and in that plan, you can  add the following tolerances:
  1. Advance Tolerance
  2. Delay Tolerance
 The tolerance considers the following logic:
  1. Advance Tolerance: if the difference between the event date and the event expected date is higher than the advance tolerance, the event will be adjusted to the new,
  2. Delay Tolerance: if the difference between the event expected date and the event date is higher than the delay tolerance, the event will be adjusted to the new data.