The meters can be loaded through individual records, in batch or by importing .csv files.
Meter values can be introduced in two ways:
- Value Increase: Difference between the current reading and the previous reading. It is used in Increment-type meters and allows you to enter the zero value;
- Meter Reading: current meter reading. It is used in Read-type meters.
The following rules must be observed when entering meter values:
- The inserted value in the Increment Value or in the Meter Reading can never be superior than the Maximum Value introduced on the meter;
- The meter reading will automatically restart when the maximum value is reached;
- You cannot record readings for the same meter and asset with the same second;
- When a meter value is deleted, all values for the same meter with a greater date will be updated to ensure conformity. The cumulative reading and the average will be recalculated.
To insert a new meter reading, follow these steps:
- Go to Assets | Measurements | Meters or Monitorings;
- Click on the Operations button to access the meter values list;
- On the meter values page, click on Create;
- Fill in the meter value data;
- Click on Save and New.